Pry the floor joist from the subfloor with the back of your hammer.
Cutting floor joists for beam.
Then use pry bars and your reciprocating saw to pry and cut the floor joist away from the subfloor.
But there are strict guidelines for notching or cutting holes in engineered floor joists.
A popular construction material these days are floor i beams sometimes called engineered floor joists you have seen them.
If your home is more than 20 years old your floor joists are most likely solid wood 2x8s 2x10s or 2x12s.
A joist is made from wood concrete and steel and it is basically a strong material that provides support and stability to the entire house.
This will create a weak spot.
Nailing two 2x4s together will work to span about three joists unless the sag is under a weight bearing wall.
Tack a beam under the sagging joists.
Sometimes joists are notched at the end where they bear on a wall or sill.
Then set new joists same height as existing ones alongside the old.
They are convenient and easy to use.
The tools i have are the standard tools reciprocating saw 7 1 4 circular saw and a chainsaw.
If the cut outs are too large or in the wrong location the joist can be weakened and unable to support the load it was designed for.
The floor joists are perpendicular to the stairs so i will need to cut a doubled 2x10 joist flush to the stairwell walls.
The notching and boring rules of thumb for solid lumber are shown in fig.
Notches will compromise the strength of the new joists but some notches are acceptable depending on their location.
Cutting floor joists flush to a wall preferred tool.
Cutting and or removing joists to provide an entry or access can be the most difficult part of the overall project.
From the side they look like a steel i beam.
Follow the rules to keep your floor solid.
A joist is a horizontal support member that holds up the wall beam ceilings and floors and connects these parts with one another and one example of the purpose of a joist is to connect the floor joist that is used to connect the stairs of a home.
In order to maintain the support integrity of the ceiling or floor joist or rafter system it is important that if joists are cut that the load that was bearing on those joists be transferred to a modified support system.