Ballet tap hip hop jazz.
Dance floor installation instructions.
Installation guide for 500 springflex hardwood dance floor systems before you begin installing your springflex floor read the instructions from start to finish.
Assuming you are going to install a marley type roll out dance floor you should always store your flooring prior to installation standing on end rolled up around a cardboard or plastic core.
If you have any questions contact dance equipment international at 1 408 267 1446.
How to install ballet dance flooring marley dance floor with sub floor.
We are happy to supply you with a written quote delivered to your door with all the products you need for your studio home or on tour.
Give us a call at 800 523 0960 or in canada 866 491 9019 to help you choose the best dance flooring or maintenance and installation products you may need.
Share your dance floor installation ideas or just your favorite dance moves in the comments section below.
Vinyl dance floor a marley dance floor should be laid out flat giving it time to relax expand contract or anything that it wants to do before it is secured by the tape.
While installing your dance floor remember that you can customize and adapt any of the steps to create the dance floor that suits you best.
Vinyl dance flooring rolls are 5 or 6 ft.
Permanent dance floor installation.
Starting in the corner of the room affix vent backing to wall using vented cove based double faced tape or cove base adhesive so that the top of the vent backing is 4 inches above the surface of the subfloor.
Dance floor is lightweight less than 2 pounds per linear foot 255 pounds per roll and flexible so it can be rolled and unrolled as needed.
Using adhesive means that if it is necessary to remove the floor the subfloor will also need to be demolished.
Install ssiv or other sub floor system as required leaving to half inch gap around perimeter of room.
Let us know what you think.
The dance floor area must be free of sharp objects no screws nails staples etc big holes cracks or seams must be filled and leveled.
Make sure that adhesive is compatible with the flooring and has the recommendation of.
First step is to roll out over the flooring the sub floor loosely for 24 48 hours so it can acclimatize.